Projects
Past Projects
Tiny sub heading that focuses on the topic mentioned above
VIETNAM BLOCK B GAS PROJECT
You can use these sections to highlight the features of heading. Use these paragraphs to focus on the topic you want. Make sure you keep it short and attractive.
- 20" KLWA-CPP Joint # 0064
- Joint # 25 in water KLWB 20" ×7.2 KM Startup Head joint # 06 on bottom
- 20" CPP-CVWA 0937 Joints in Water out of 1331
- Diving assistance during jacket installation as required.
- Pipeline profile check and roller check on stinger
- Pipe Lay Barge Stinger check during installation
Schematic Overall Pipeline Ardjuna Marine Terminal Phase-2
You can use these sections to highlight the features of heading. Use these paragraphs to focus on the topic you want. Make sure you keep it short and attractive.
- #1 24 IN Spool to SSV
- #2 24 IN Spool to New PLEM B
- #4 16 IN Spool to New PLEM A
SATURATION DIVING SERVICES FOR MEDCO BRONANG PROJECT
You can use these sections to highlight the features of heading. Use these paragraphs to focus on the topic you want. Make sure you keep it short and attractive.
- Installation of new subsea spool
- Installation & pre-commissioning of new pipeline 14”
- Bawal Pipeline KP 20.4 subsea spool replacement
- Hydrotest & re-certification
We Provide the Best Service in Industry
Add a line that tells users how easily they can get in touch with you